Construction of underground forwarding lines and subyards / Production of N model railroad layouts
SUSUKUMA Japanese Model Railroad Channel SUSUKUMA Japanese Model Railroad Channel
56.9K subscribers
694,669 views
5.5K

 Published On Sep 2, 2022

Pass the forwarding track under the board of the home N gauge layout.
The destination is a small yard for changing vehicles.
We did not dare to set up a structure and emphasized convenience.


[Introduced items]
▶ TOMIX end rail E with noise canceller
⇒ https://amzn.to/3RbSsbU

▶TOMIX slab rail S280-SL (set of 4)
⇒https://amzn.to/3TA4WvA

[Recommended video]
▷Freight Line Underground (Thank you for playing 330,000 times)
⇒   • 貨物線 地下へ / 鉄道模型 Nゲージ レイアウト製作  

▷ Example of modification of GM washing machine kit (larger by using 2 sets)
⇒   • GM 洗浄機キットの改造例 / 鉄道模型 Nゲージ  

【playlist】
▷ How to make a layout board
⇒   • レイアウトボードの作り方  

-------------------------------------------------- --------------------

★ Membership
⇒   / @susukuma  

★Twitter
⇒  / susukuma113  

★Instagram
⇒  / susukuma113  


0:00 Build an underground transmission line and subyard!
0:24 Make a roadbed
1:42 PECO flexible rail
4:01 Storage track (TOMIX rail)
5:32 ① KATO Keikyu 2100
7:12 ② TOMIX 215 series
7:47 ③ TOMIX EF65 + wagon
9:02 ED (I would be very happy if you could subscribe to the channel. Thank you for watching till the end♪)


BMG: Youtube Audio Library Free music that does not require attribution

#modeltrain #Nscale #Layoutupdate

show more

Share/Embed