POURING A CONCRETE SLAB IN WINTER..CONSERVATORY TO EXTENSION PT 5 WE ARE BATTLING RAIN AND FROST AS ITS THE BEGINNING OF DECEMBER.
FIRST JOB IS TO LOAD OUT 800 BRICKS WHICH WE COVER UP WITH OUR BRICK JACKETS.
THE HARDCORE AND SAND BLINDING ARE ALREADY DONE SO WE JUST NEED TO INSTALL THE COLD BRIDGING STRIP WHICH IS 25 MM JABLITE POLYSTYRENE. NEXT THE 1ST DPM WHICH PROTECTS THE INSULATION WHICH GOES DOWN NEXT. THIS IS 100 MM FOIL BACKED PIR IN 2.4 X 1.2 M SHEETS. NEXT THE TOP LAYER OF DPM GOES DOWN.
NEXT WE GET A VISIT FROM BUILDING CONTROL WHO GIVES US THE GO AHEAD TO POUR THE SLAB.
THE CONCRETE COMPANY LADS TURN UP EARLY AND BARROW THE CONCRETE IN FOR US.
FINALLY WE GET THE CONCRETE TAMPED AND FLOATED.

#construction #bricklaying #extension