Published On Jul 14, 2024
Just having fun running some new to me cars and locos. It took 45 minutes of tying to get this right because I was doing everything by myself. Most notable that is new is another Reading SW1 and the very cool "1 of a kind in S Scale" Norfolk Southern Protector coil steel car. I just LOVE the 4 high hood units running on the inside freight bypass track. The Demo SD60 really was pushing but the 2 lead units could pull the train just fine.
show more