Rironi to Gitaru- The eternal construction site!
of Roads and Places of Roads and Places
1.18K subscribers
250 views
17

 Published On Jan 26, 2022

As per KENHA records, this road is 30% complete (Aug 2021). At this pace, my 4-year old will start driving before it is complete! Did I also mention that the road is a hazard to every road user? No regard for pedestrians, drivers and riders alike.

🚗🚗🛌🛌🥗🥗
Instagram 🌈: ofroadsandplaces
Twitter 🐤: @RoadsPlaces
Facebook 📘: Roads Places

Music:
At Night by Spiring   / user-57630131  
Creative Commons — Attribution 3.0 Unported — CC BY 3.0
Free Download / Stream: https://bit.ly/3dbjnSR
Music promoted by Audio Library At Night – Spiring (No Copyright Music)

Lazy Boi by Smith The Mister https://smiththemister.bandcamp.com
Smith The Mister https://bit.ly/Smith-The-Mister-YT
Free Download / Stream: https://bit.ly/3G0Rd9l
Music promoted by Audio Library Lazy Boi – Smith The Mister (No Copyright Music)

Lazy Boi by Smith The Mister https://smiththemister.bandcamp.com
Smith The Mister https://bit.ly/Smith-The-Mister-YT
Free Download / Stream: https://bit.ly/3G0Rd9l
Music promoted by Audio Library Lazy Boi – Smith The Mister (No Copyright Music)

Be The One (feat. Anaïk) by Vendredi   / vendrediduo   Creative Commons — Attribution 3.0 Unported — CC BY 3.0 http://creativecommons.org/licenses/b... Music promoted by Audio Library Be The One (feat. Anaïk) – Vendredi (No Copyright Music)

show more

Share/Embed