Train Layout Update, 58’ of Track Addition with 090 and Bridge, No Talk, 3 Train Running Action!
Motocraze40 2018 Motocraze40 2018
2.83K subscribers
894 views
67

 Published On Jan 15, 2024

Added a third loop of track with inclines and declines.

Added S curves to other two lines.

Straightened inside line of the extended figure 8 line for long diagonal run.

show more

Share/Embed