Published On Mar 18, 2015
http://www.taftc.org For Lean Training Programme,
Please contact TaF.tc +65 3157 6111 or email [email protected]
Global Lean Conference 2014
Building a Lean Culture
- 1 Lean Production Line
- Reduction of works from 31 to 12
- Reduce leadtime by 45% from sewing to packing
- Reduction of operation by 50%
- Increase productivity per hour/worker by 68%
- Overall reduction in labour cost ratio per piece by 40%
- Increase profitability ratio per unit by 390%
http://www.taftc.org • Lean Production Line | TaF.tc
show more