Leyland Tiger Bus & Coach Maintenance Part 1 - TL11 Engine - ZF, Pneumocyclic & Hydracyclic Gearbox
Transport Archive Transport Archive
1.17K subscribers
5,010 views
79

 Published On Mar 31, 2023

This Leyland Bus training video looks at the maintenance procedures that should be carried out on the Leyland Tiger coach.

Part 1 covers Leyland TL11 engine oil / filter changes, fuel filter replacement, air intake / filter, injector removal / replacement, valve clearances, engine cooling system, ZF manual gearbox, clutch adjustment, Hydracyclic gearbox oil change / maintenance, Leyland LVA gearbox control system, retarder maintenance checks, Pneumocyclic gearbox oil change / adjustment and Telma retarder maintenance.

This video includes two Leyland Tiger demonstrators: C396 DML with Van Hool Alizee coachwork and B263 AMG with Plaxton Paramount 3500 coachwork.

Thank you for watching, I hope you enjoy the video. Please remember to like and subscribe!

show more

Share/Embed