HO Train Bridge Addition To the Layout - Dual Track
SMT Mainline SMT Mainline
140K subscribers
56,151 views
1.8K

 Published On May 13, 2023

I've been meaning to replace a single track bridge on the layout for a while now since it's had structural issues. I also wanted to add a secondary track to allow for two separate lines of operation. I'm overall happy with the results.

show more

Share/Embed