MRT Putrajaya Line - Stesen Kuchai (PY27) | Kuchai Station - MRT Putrajaya Line (4k Video)
Fawwaz Media Fawwaz Media
27.1K subscribers
4,577 views
81

 Published On Aug 30, 2022

MRT Putrajaya Line: Phase 2 (scheduled to open in March 2023)

1. Kentonmen (PY14):
   • Stesen MRT Kentonmen (PY14) Jalan Ipo...  

2. Jalan Ipoh (PY15):
   • Stesen MRT Jalan Ipoh (PY15) - MRT Pu...  

3. Sentul Barat (PY16) - Underground:
   • MRT Sentul Barat (Underground) MRT Pu...  

4. Titiwangsa (PY17) - Underground:
   • MRT Putrajaya Line - Stesen Titiwangs...  
   • Stesen Titiwangsa: MRT Putrajaya Line...  
Interchange station with LRT Ampang Line, LRT Sri Petaling Line and KL Monorail.

5. Hospital Kuala Lumpur (PY18) - Underground:
   • Stesen Bawah Tanah MRT Hospital Kuala...  

6. Raja Uda (PY19) - Underground:
   • MRT Putrajaya Line PY19 (Underground)...  

7. Ampang Park (PY20) - Underground:
   • Ampang Park Station PY20 - MRT Putraj...   (NEXT WEEK)
Connecting station with LRT Kelana Jaya Line.

8. Persiaran KLCC (PY21) - Underground:
   • MRT Persiaran KLCC Station PY21 - MRT...  

9. Conlay (PY22) - Underground:
   • MRT Putrajaya Line - Conlay Station P...  

10. Tun Razak Exchange (TRX) (PY23) - Underground:
   • Stesen MRT TRX PY23 (Tun Razak Exchan...  
Cross-platform interchange with MRT Kajang Line.

11. Chan Sow Lin (PY24) - Underground:
   • MRT Chan Sow Lin - Stesen Bawah Tanah...  
Interchange station with LRT Ampang and Sri Petaling Line.

12. Bandar Malaysia Utara (PY25) & Bandar Malaysia Selatan (PY26)- Underground (Provisional Station):
   • Tapak Stesen MRT Putrajaya Line - Ban...  
Construction works are being carried out

13. Kuchai (PY27):
   • MRT Putrajaya Line - Stesen Kuchai (P...  

14. Taman Naga Emas (PY28):
   • MRT Putrajaya Line - Taman Naga Emas ...  

15. Sungai Besi (PY29):
   • MRT Sungai Besi - Putrajaya Line (PY2...  
Interchange station with LRT Sri Petaling Line.

16. Taman Teknologi (PY30) (Provisional Station):
Construction work has not yet started

17. Serdang Raya Utara (PY31):
   • MRT Serdang Raya Utara - Putrajaya Li...  

18. Serdang Raya Selatan (PY32):
   • MRT Putrajaya Line - Serdang Raya Sel...  

19. Serdang Jaya (PY33):
   • MRT Putrajaya Line - Serdang Jaya (PY...  

20. UPM (PY34):
   • MRT Putrajaya Line - UPM (PY34) | UPM...  

21. Taman Universiti (PY35) (Provisional Station):
   • MRT Putrajaya Line - Stesen Taman Uni...  

22. Taman Equine (PY36):
   • MRT Putrajaya Line Stesen Taman Equin...  

23. Putra Permai (PY37):
   • MRT Putrajaya Line - Stesen Putra Per...  

24. 16 Sierra (PY38):
   • MRT Putrajaya Line 16 Sierra Puchong ...  

25. Cyberjaya Utara (PY39):
   • MRT Cyberjaya Utara - MRT Putrajaya L...  

26. Cyberjaya City Centre (PY40):
   • MRT Putrajaya Line - Cyberjaya City C...  

27. Putrajaya Sentral (PY41):
   • Putrajaya Sentral (PY41) - MRT Putraj...  
Connecting station with ERL KLIA Transit.


The Kuchai MRT Station is a Mass Rapid Transit (MRT) station serving the suburb of Kuchai Lama area in Kuala Lumpur, Malaysia. It is one of the elevated station on MRT Putrajaya Line.

The station is located besides Jalan Kuchai Lama. The station has been built based on Island Platform architecture.

Covered car park and motorcycle bays are available for this station. TnG payment option is available. More information on Park n' Ride.

Kuchai MRT Station is expected to complete and start operation on 1st half of 2023.

----------------

The ground breaking ceremony, which was officiated by then Prime Minister Dato’ Sri Mohd Najib Tun Abdul Razak, was held at the site of the future Putrajaya Sentral Station on 15 September 2016, marking the commencement of construction works of the Putrajaya Line.

The Phase One operations from Kwasa Damansara to Kampung Batu commenced on 16 June 2022. Phase Two operations, which will see the remaining section of the line from Kampung Batu to Putrajaya Sentral being opened, thus allowing trains to run from Kwasa Damansara to Putrajaya Sentral, is expected to commence in January 2023.

At commencement of full service, the Putrajaya Line is expected to have an initial ridership of over 104,000 passengers upon opening. This is expected to further improve the chronic traffic congestion currently faced by Kuala Lumpur.
#malaysia #fawwazmedia
-------------
Flowing Energy by Keys of Moon |   / keysofmoon  
Music promoted by https://www.chosic.com/free-music/all/
Creative Commons CC BY 4.0
https://creativecommons.org/licenses/...

show more

Share/Embed