How to calculate Bbs of footing, raft steel calculation
Dream of Civil engineers Dream of Civil engineers
2.12K subscribers
280 views
3

 Published On May 14, 2023

Calculate BBS for Footing


Calculating the Bar Bending Schedule (BBS) for a footing is a crucial step in the construction process, ensuring that the right amount of reinforcement bars are used to provide structural integrity and stability to the foundation. A well-prepared BBS helps contractors, engineers, and workers understand the layout, size, and quantity of bars required for the footing. Here's a comprehensive guide on how to calculate the BBS of a footing.

1. Understanding the Design:
Start by thoroughly understanding the architectural and structural design drawings of the footing. The drawings should indicate the dimensions, shape, and positions of bars.

2. Gather Information:
Collect all the necessary information from the drawings, including the sizes and grades of the reinforcement bars, the spacing between bars, clear cover, and any special requirements.

3. Prepare a Sketch:
Create a sketch or layout of the footing, illustrating the arrangement of bars. This can be done manually or using computer-aided design (CAD) software for accuracy.

4. Calculate Total Length of Bars:
Calculate the total length of each type of reinforcement bar required for the footing. This involves measuring the perimeter and the length of each bar along the perimeter. Sum up the lengths to get the total.

5. Determine Number of Bars:
Based on the specified spacing and arrangement of bars, calculate the number of bars required along the length and width of the footing. Ensure you account for any variations at corners or intersections.

6. Calculate Cutting Length:
Determine the cutting length of each bar, which takes into account the shape of the footing and the bending requirements. This is calculated as the sum of the development length and the extra length needed for bending.

7. Add Bending Length:
Calculate the bending length for bent bars or hooks at the ends of the bars. This length depends on the bar size, angle of bend, and diameter of the hook.

8. Calculate Bar Weight:
Determine the weight of each type of bar using the appropriate formula. This takes into account the bar diameter, unit weight of steel, and length.

9. Prepare the BBS:
Create a tabular format to list all the calculated values for each type of bar. Include details like bar number, diameter, length, cutting length, bending details, quantity, and weight.

10. Check for Errors:
Thoroughly review the BBS for any errors in calculations, measurements, or placements. This step is crucial to avoid mistakes that could impact the structural integrity of the footing.

11. Update as Needed:
If there are any design changes, modifications, or adjustments, update the BBS accordingly. It's important to maintain accuracy throughout the construction process.

12. Share with Stakeholders:
Once the BBS is finalized and verified, share it with the relevant stakeholders, including contractors, engineers, and workers. This ensures everyone is on the same page and follows the approved reinforcement plan.

Conclusion:
Calculating the Bar Bending Schedule for a footing is a meticulous process that requires attention to detail and accuracy. It's a critical step in the construction workflow, contributing to the overall structural strength and durability of the foundation. By following these steps, construction professionals can ensure that the footing is properly reinforced, meeting safety standards and design requirements
#how to calculate bbs of footing
#staircase
#civil
#civilengineering
#civilservices
#civilengineer

show more

Share/Embed