Most waited Mumbai underground metro
Ravinder Saini Ravinder Saini
478 subscribers
259 views
15

 Published On Oct 7, 2024

Most waited Mumbai underground metro Aarey 2 BKC #metro #mumbai #aarey #bandrakurlacomplex #viralvideo #viralreels #vlogs #trending Mumbai Metro 3 Details The Mumbai Metro Rail Corporation (MMRC) is developing this extensive 33.5-kilometre-long metro line, which will feature 27 stations in total. The first phase specifically starts at Aarey and concludes at BKC, providing crucial access to several key areas in Mumbai. Mumbai Metro 3 Fare 1. The minimum fare on the Aarey to BKC route will be Rs 10. 2. Passengers travelling from Aarey JVLR to Marol Naka will pay Rs 20. 3. For those heading to the Airport T1 terminal, the fare will be Rs 30 from Aarey JVLR. 4. The fare to Bandra Colony station will be Rs 40. Currently no food water option available. Took 20min from seepz to bkc. Train in every 6 min

show more

Share/Embed